Construction Notice – September 29, 2014

September 24th, 2014

Campus Drive, Roth Way Extension Partial Road Closures at Night, Pedestrian Detours Begin September 29, 2014

Construction for PG&E gas main installations will begin on Monday, September 29. Partial lane closures of Campus Drive will occur at night from 7pm to 7am. During the day, steel plates will be placed and Campus Drive will remain open to all traffic. At night, two driving lanes along Campus Drive will remain open at all times, and driving routes will not be impacted. Construction will occur along Campus Drive between Via Ortega and Quarry Road and along the Roth Way Extension.

Pedestrian access will change. A portion of the sidewalk along Campus Drive will be closed. Way-finding signage will be in place to assist pedestrians during this time. If you park in Parking Structure 1, you will be directed to cross at the intersection of Roth Way and Campus Drive. For your safety, please follow alternative pedestrian crosswalks and pathways during construction.

Campus Dr Partial Road Closure Flyer 9.24.14